Back to Brick Works Series

Brick Works Manchester


Manchester website

Brick Works Manchester

We're thrilled to invite you to Brick Works Manchester, an exclusive evening hosted by the Brick Development Association in partnership with IG Masonry Support.

Join us on 19th November 2026 at the 53Two, for an evening filled with networking, insights, and celebration of clay brick architecture. This is a unique opportunity to connect with industry peers and explore the latest in brick innovation - we look forward to seeing you there!

What's Included?

  • Informative presentations from Industry leaders and Architects
  • Complimentary refreshments throughout the evening
  • Networking opportunities

Event Details

Venue: 53Two, Arch 19 Watson St, Manchester M3 4LP

When: 5.30 PM - 8.30 PM

Meet The Speakers

House of Social Ben Harrison Photos 3

Presentation: House of Social

Join Richard Lord, Technical Specification Manager at IG Masonry Support, and Simon Davies of Tim Groom Architects as they present House of Social, a 14-storey student living development at First Street in Manchester. Developed by Vita Group and delivered by main contractor Renaker, with brickwork contractor PLF Ltd, the project introduces a new approach to student accommodation, combining shared five- and six-bedroom apartments with spacious communal kitchens and lounges.

Designed to encourage social interaction and community, House of Social brings together contemporary architecture and extensive shared amenities, including a ground-floor food hall, gym and co-working facilities. The development forms part of the wider First Street neighbourhood, contributing to Manchester’s evolving city-centre landscape and the growing demand for high-quality student accommodation.

The project’s façade presented a number of technical and coordination challenges, including wide and variable cavities, stonework elements and brickwork at multiple levels. The team also needed to coordinate complex cladding interfaces, accommodate detailed slab survey information and maintain installation progress across the 14-storey structure, with brickwork installed above mast climbers.

Through close collaboration between the design team, main contractor and brickwork contractor, the project required careful planning and sequencing to manage changing façade conditions and structural interfaces while maintaining programme continuity. The presentation will explore the project’s design and delivery, highlighting the coordination involved in achieving the architectural vision across a complex, multi-storey development.

Presentation: The Hibbitt Centre

Join Philip Etchells, Associate Director at OMI Architects, as he presents The Hibbitt centre. Completed in March 2026 The Hibbitt Centre is a combined Six Form Centre and Sport’s Pavilion Building at the Manchester Grammar School.  Over 500 years old, the school moved to its current site in Rusholme in the 1920s.  Today it is a private school for boys aged 7-18 with a total of over 1,600 students, 15-20% of whom receive bursary support (on average covering 94% of fees) to attend.

The school campus had expanded in a piecemeal manner over the previous 100 years reducing the legibility and cohesion of the original design.  The new building was therefore envisaged as an attempt to address site-wide issues as well as sit comfortably within its context and meet the requirements of the brief.

The new building provides sixth form specific facilities such as dining room, classrooms, common room and support spaces.  In addition, the brief also required the provision of new sports changing rooms and associated facilities. 

The ‘L-shaped’ building connects with and mirrors an existing building to form a new quadrangle.  An east-facing wing, contained under a pitched clay-tile roof, provides a dining room at ground floor with classrooms above.  A south-facing wing contains changing rooms and sports facilities within a solid masonry plinth acting as a contrast to a extensively glazed light-weight common room above.

The deeply recessed building entrance is located at the junction of the two wings and is articulated by an external staircase giving access to a first-floor terrace that provides views of the adjacent sports pitches. The stair also introduces a diagonal element into an otherwise strongly horizontal composition.

The detailing and materiality of the building was informed by Neo-Georgian style of the buildings the school had built in the 1920s.  Constructed of dark red sand-faced bricks, clay roof tiles and large sash windows, these buildings have a scale and mass that is offset by the richness of the brickwork detailing.

The new building embraces the solidity and connotations of permanence and continuity that is implied by the use of well detailed clay brickwork.  Openings have soldier-coursed lintels at their heads and, when these openings become larger, these become a double course which extend to the underside creating brickwork soffits or ‘beams’.  Recessed brickwork panels express the structural ‘bays’ of the new building and horizontal recessed brick banding replicates a detail found on the 1920s buildings.

Discrete areas of contrasting white brickwork are introduced between windows, within recessed panels to the courtyard elevations as wells to cylindrical brick columns which demarcate the building’s entrances.  Brickwork is also introduced in key internal areas, visually bringing the external facades into the building and providing a robust wall treatment to high traffic areas.

The project demonstrates how a sensitive approach to context and a considered use of high-quality robust materials can create a building that positively contributes to its environment as well as providing accommodation suitable to the needs of current and future students.

MGS 40
IMG 9539

Presentation: No. 3 Circle Square

Join Russell Bridge to discover the final piece of the Circle Square masterplan. No 3 Circle Square is a new build 15 storey office building on the former BBC site at the head of the Oxford Road corridor in Manchester city centre.  The project includes new public realm space; Symphony Gardens, which extends the green parkland at the heart of Circle Square with a lush planting scheme.

The building was designed speculatively for Bruntwood SciTech, and includes open-span 20,000 sqft floorplates, a large arrival space, two retail units, secure bike storage, changing and customer amenity provisions at ground and 14th floor levels, and two roof terraces with panoramic city views.

Sustainability is central to the building’s design. It is net zero carbon in operation of shared spaces, with BREEAM Excellent, NABERS 5 star and EPC A ratings. Energy efficient technologies include electric heating powered by advanced heat pumps, mechanical ventilation with heat recovery, rooftop solar panels, and a smart Building Management System.

 The building uses a red brick, punched-opening elevation sat on an oversized-arched base – architectural languages which reference the local Georgian and Victorian red brick buildings and adjacent railway arches.   The building sits alongside the adjacent NCP car park building, reading as a sturdy ‘brother and sister’ pair of carved red-brick buildings on Princess Street, with the pair of buildings complementing the rest of the Circle Square development, but using their own robust architectural language.

A long-format, York Handmade brick is used, with a dark red, weatherstruck mortar joint. Window frames are a metallic mid-bronze, with structural glass arched windows at ground floor level.

Bridge Architects were responsible for architecture, interior design and styling from concept to completion, and the design encompasses a high attention to detail from the big concept idea to the delivery of the smallest detail, with the aim being to enhance and prioritise the customer experience throughout.

Past events

Use your arrow keys to explore
Norton Folgate Jack Hobhouse Full scheme
Image 46

2025
Brick Awards

2025 Shortlist Announced